DOWNTOWN ALMONTE CONSTRUCTION 2022-2023 

Construction Update 

Concrete Sidewalk and Curbs

Thomas Cavanagh Construction has started installing concrete sidewalks within Phase B of the Downtown Core Infrastructure Renewal Project. This will be completed in phases over the next two weeks.  Affected businesses will be accommodated with accessibility ramps to enter and exit buildings while the concrete works are curing. 

Below is a drawing markup sketch outlining the proposed timeline for concrete works within Phase B.  Any areas remaining will be reinstated with temporary asphalt for the winter months to allow for future phasing of works without disturbing the newly installed concrete sidewalks. 

 

 

Road Grading and Asphalt

Once concrete works are completed, Cavanagh will mobilize equipment to complete placement of granular material for road base in preparation for asphalt.  This work is scheduled to be completed between November 28th to November 30th.  Placement of the road asphalt is scheduled for December 1st, 2022.  Any temporary asphalt sidewalk reinstatement works will be completed at this time. 

Pedestrian crossovers

Three new pedestrian crossovers have been installed within Phase A: one to cross Almonte Street and two on Mill Street.  The new crossovers include pedestrian activated rapid flashing beacons to allow for safe pedestrian passage.  These three locations will be operational once crosswalk line painting has been completed. 

Cavanagh Construction Contact Info

Cavanagh Construction has delivered their notification to residents and businesses; they can be contacted at the following:

Hilary Lalonde
Project Manager
Thomas Cavanagh Construction Ltd.
Cell: 613-298-8524
Email: HLalonde@thomascavanagh.ca 

ALTERNATE AFTER HOURS

Nathan Drew
Sewer & Water Superintendent
Thomas Cavanagh Construction Ltd.
Cell: 613-314-5782

Randy Kubusheskie
Roads Superintendent
Thomas Cavanagh Construction Ltd.
Cell: 613-913-9252 

 

For More Information

We request that property owners and businesses provide contact information to ensure you receive any future notifications.  Emails can be sent directly to the project manager listed below.  Should you have any questions, comments or concerns related to the project or require special accessibility accommodations, please let us know by contacting the project manager noted below.  Your communication is critical to ensure this project is a successful one.

The Municipality of Mississippi Mills would like to thank you for your patience and co-operation during this construction project.

Robert Smith
Project Manager
Roads & Public Works Technologist
Mississippi Mills
613 256 2064 x404
smithr@mississippimills.ca

Cory Smith
A/ Director of Roads & Public Works
Mississippi Mills
613 256 2064 x401
csmith@mississippimills.ca